Autoplay
Autocomplete
Previous Lesson
Complete and Continue
TRBC Intermediate : Calculation Rules
Getting Started
Course Instructions (Important)
Course Requirements
Course Guideline
Course Material
Introduction
Course Introduction - Calculation Rules (1:11)
Chapter 1 - Introduction to Calculation Rules
Chapter 1- Introduction to Calculation Rules (6:04)
Chapter 2 - Column
Chapter 2.7 - Links in Anchorage (13:44)
Chapter 2.3 - Different Size Columnn (3:16)
Chapter 2.4 - Rectangular Links and Spiral Links (2:27)
Chapter 2.5 - Surplus Rebar (11:21)
Chapter 2.2 - Kicker and Links (7:57)
Chapter 2.6 - Foundation Starter Bar (7:36)
Chapter 2.1 - Staggered Distance (3:06)
Chapter 3 - Wall
Chapter 3.1 - Wall Additional Reinforcement and U-Bar Details (5:11)
Chapter 3.2 - Hooks & Middle Bars at Corners (12:25)
Chapter 3.3 - Anchorage Settings and Connection Settings (9:56)
Chapter 3.4 - Binder, Steel Fabric Lapping & Removal of U-Bars (7:10)
Chapter 4 - Slab
Chapter 4.1- Main Bar Anchorage and Bend (6:58)
Chapter 4.2 - Slab Support Bar Adjustment (5:17)
Chapter 4.3 - Trimmer bar, Cantilever Slab, Support Bar and Distribution Bar (8:01)
Chapter 4.4 - Variable Slab Drop (5:55)
Chapter 5 - Foundation
Chapter 5.1 - Pile Cap and Raft Foundation (8:09)
Chapter 5.2 - Sump Pit (3:45)
Chapter 5.3 - Pad Foundation and Strip Foundation (6:24)
Chapter 5.4 - Steel Fabric for Raft Foundation (5:54)
Chapter 6 - Ground Beam
Chapter 6 - Ground Beam VS Frame Beam & Anchorage Settings (4:58)
Chapter 7 - Masonry Structure
Chapter 7 - Stiffener and Ring Beam Settings (8:25)
Chapter 8 - Others
Chapter 8 - Kerb Settings (3:43)
Summary
Contact us here if you need assistance
Get an Intermediate Certificate
Chapter 5.2 - Sump Pit
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock